Full Concrete Lined Section of Headrace Tunnel
Turbine Guide Bearing erection in Underground Powerhouse
Fire Fighting Water Supply Pipe (Left) and HV Cable Tray (Right) laid on Access Tunnel to Powerhouse
Underground Powerhouse Ready for Generator Erection
Diversin Weir and Undersluice
Headrace Tunnel ready for Concrete Lining
Intake Operating Slab
Intake Operating Slab2
Intake Orifice and Diversion Weir
Underground Desanding Basins Cleaned for Concrete Placing in Hopper
Hydrailic Formworks for Headrace Tunnel Concrete Lining
previous arrow
next arrow
 

About the company

The Peoples Hydropower Company Private Limited (PHCPL) was established on Ashwin 22, 2064 (Oct 09th, 2007) under the Company Act 2063 of Nepal as private company. The proponents of the Company include a different person from
multidisciplinary sectors interested in hydropower development. The main objective
of the company is to develop Hydropower Projects in Nepal.

MESSAGE FROM BOARD

U.N. SHRESTHA

Chairman

It is told by the world that Nepal is the second largest country having potentiality in hydro electricity generation. But it has not been able to harness its potentiality even for meeting the need of its own peoples; despite it could contribute to electrify Asian countries with ample national income.

KESHAV BDR RAYAMAJHI

MANAGING DIRECTOR

As we are the pioneer in the field of hydropower energy and I believe we can optimize the every source of our nepal hydropower energy consumption and strengthen our country’s economic status to higher level.

ARJUN P GAUTAM

Project DIRECTOR

OUR PROJECTS

Super Dordi

It is a Run-of-River type of project utilizing water of Dordi Khola and collection of Purmu at the Adit site. The discharge of Dordi Khola shall be diverted to the left side of the river towards gravel trap. Course material up to 20mm shall be settled in Gravel Trap.

Himchuli Dordi is a 57MW hydro power project. It is planned on Dordi river/basin in Gandaki, Nepal.

NEWS & UPDATES